Open assumptions / Explainable calculations

How PatioBoQ calculates quantities and reviews quotes.

The calculator uses deterministic arithmetic. The paid pilot uses human review of the written quote. Neither can replace a site survey or a project-specific construction design.

The calculation chain

QuantityFormula
Net areaSum of non-overlapping rectangle areas, minus specified cutouts
Paver order areaNet area × (1 + paver waste percentage / 100)
Compacted base volumeNet area × compacted base thickness
Bedding volumeNet area × bedding thickness
Bank excavationNet area × total layer thickness, under the stated level assumption
Loose spoil volumeBank excavation × soil swell factor
Theoretical base massCompacted base volume × selected compacted density

The engine converts inputs to metres before calculating and rounds only the displayed results. A foot is exactly 0.3048 m, an inch is 0.0254 m, and a cubic yard is 0.764554857984 m³. These use the international foot, not the obsolete US survey foot.

Reference: NIST SI conversion factors.

Worked example: a 20 × 14 ft patio

This is an estimating example, not a recommended construction design. It assumes 60 mm pavers, 25 mm bedding, 150 mm compacted base, 10% paver waste and a 1.25 spoil swell factor. Finished and existing ground levels are assumed equal.

Example quantities, calculated with the same engine as the interactive tool
QuantityUS unitsMetric units
Net patio area280.00 sq ft26.01 m²
Paver order, 10% allowance308.00 sq ft28.61 m²
Compacted base5.10 cu yd3.90 m³
Bedding sand0.85 cu yd0.65 m³
Bank excavation8.00 cu yd6.11 m³
Loose spoil, 1.25×9.99 cu yd7.64 m³

Displayed quantities are rounded to two decimals. Confirm material specifications and delivery units with your supplier before ordering.

What the defaults do not establish

The default 150 mm base, 25 mm bedding, 60 mm pavers, 10% waste, 1.25 soil swell and 2.0 tonnes/m³ base density are editable estimating examples. They do not establish appropriate depth, drainage, structural capacity, material compatibility or regulatory compliance for your property.

The excavation estimate assumes the finished surface matches the existing ground level. It does not include demolition, base extension, overdig, slope changes, unsuitable soil replacement or underground obstructions. Aggregate ordering needs a supplier conversion; disposal needs separate material and weight checks.

Multiple rectangle dimensions alone do not define shared edges. The engine therefore does not give a certain perimeter for multi-part geometry or cutouts. Measure exposed edging from a plan.

How the quote review works

  1. You provide dimensions, project scope and a written quote.
  2. An operator checks readability and whether the project fits the pilot before offering payment.
  3. A reviewer records the original text and page number for supported claims.
  4. Scope status and quantity comparison status are assessed separately.
  5. You receive clarification questions in your private project workspace.

The pilot does not use automated OCR or an AI system to decide whether the contractor’s price is fair. When evidence is insufficient, the appropriate result is a question or an “insufficient data” status, not a fabricated conclusion. See the synthetic example report.

Construction context and corrections

CMHA’s construction guidance describes separate tasks such as subgrade preparation, base placement, bedding and edge restraints. The applicable project specification and manufacturer’s instructions still govern the selected system. A checklist category is not a universal requirement to add that item on every job.