Free / no account required

Plan the layers.
Understand the quantities.

For a rectangular pedestrian patio. Edit your assumptions to match a supplier’s specification or site design.

150 mm is 5.906 inches, not exactly 6 inches. Defaults are examples, not design recommendations.

Bank excavation = area × total layer depth, assuming unchanged finished level. Loose spoil = bank volume × swell factor. Waste applies to paver order area only. Compacted volume is not loose aggregate delivery volume.